Instruction to Tenderers :
1.1 COVER-1 (Technical bid) shall contain the following
documents.
i) All the documents sought under Pre-Qualification
Criteria.
ii) The requisite EMD
iii) Latest copy of the Income Tax return mentioning
the PAN and TAN Nos.
iv) Latest copy of Sales Tax Clearance certificate.
v) EPF registration certificate.
a) In respect of contractors who are not registered
with the EPF (Employees Provident Fund) authorities,
the contractors should produce an undertaking that he
shall, within 7 days of the close of every month submit
to the Executive Engineer a statement showing the recoveries
of contribution in respect of employees employed or
through him and shall also furnish such information
as the Executive Engineer is required to furnish under
the provision of the scheme to the commissioner EPF.
b) However, having given an undertaking to this effect
if the contractor does not furnish the information,
the Nigam will deduct the necessary amount from the
amount due to the contractor. Not with standing the
above, the contractor will be liable for any consequential
penalty/damages levied by the EPF authorities.
vi) Technical bid containing document in support of
fulfilling pre-qualification criteria stipulated separately.
vii) The bidder should also furnish the list of works
on hand with all details such as bid cost, date of entrustment,
stipulated date of completion, actual date of completion,
completed cost of work etc.,
COVER-II Shall contain the financial bid.
2. The Cover-I (Technical bid) will be opened first
and thereafter Cover-II (Financial bid) of only those
bidders who fulfill the pre-qualification criteria and
other conditions as mentioned at Para 1.1 will be opened.
3. Issue and submission of tender documents.
3.1 E-Tendering
3.1.1 Aspiring bidders who wish to undergo training
to e-tendering should submit their request in writing
to undersigned on or before 28.05.2010 and the training
will be conducted for such contractors on 01.06.2010
at 11.00 am at the centre for e-governance MS building,
Bangalooru-1.
3.1.2 The aspiring contractors who have not previously
obtained the user ID and Password for participating
in e-tendering may now obtain the same by requesting
in writing to the Managing Director, KBJNL Regd.office,
Bangalooru office on or before 31.05.2010.
3.1.3 The Contractors can request for e-tendering documents
from 05.06.2010 in the web site http://eproc.karnataka,gov.in
link e-tender document on payment (non refundable) of
Rs.2500.00 towards the transaction fee. While applying
the contractors can pay the transaction fee in the e-procurement
portal using payment modes- 1) Credit card/ Direct Debit/
National Electronic Fund Transfer (NEFT)/ Over the Counter
(OTC) on 05.06.2010 during office hours.
3.1.4 The contractor can have access to e-tender document
from 05.06.2010 to 11.06.2010 upto 5.00pm.
3.1.5 Submission of completed e-tendering document will
be from 05.06.2010 to 11.06.2010 up to 5.00 pm.
3.1.6 Cover-I (Technical bid) will be opened electronically
in the office of the Chief Engineer, KBJNL, O&M Zone,
Narayanapur on 16.06.2010 at 11.00 am.
3.1.7 Cover-II (Financial bid) of qualified bidders
will be opened in the office of the Chief Engineer,
KBJNL, O&M Zone, Narayanapur on 18.06.2010 or at a convenient
date with due intimation to all the qualified bidders.
3.1.8 The contractor can pay the Earnest money deposit
(EMD) in the e-procurement portal using any of the payment
modes such as. a) Credit card, b) Direct debit, c) National
Electronic Fund Transfer (NEFT), d) Over the Counter
(OTC). The EMD amount submitted by the contractor should
govern the following conditions a) EMD will be accepted
only in the form of electronic cash (and not through
Demand draft or Bank guarantee) and will be maintained
in the Govt's central pooling A/c at Axis Bank until
the contract is closed. b) The entire EMD amount for
a particular tender has to be paid in a single transaction.
For details on e-Payment services refer to e-procurement
portal for more details on the process.
3.1.9 The necessary certificates/ documents in support
of pre qualification criteria fulfilled as stipulated
shall be scanned and attached to e-tender document.
3.1.10 The original certificates/ documents shall be
produced at the time of opening of tender containing
technical bid for verification. Scanned signature of
the bidder/authorized representatives of the bidder
shall be attached while uploading the bid document.
3.1.11 Further information about electronic tendering
can be had from http://eproc.karnataka.gov.in
4. Pre-qualification criteria:
4.1 Contractor who meet/s the following Pre-Qualification
criteria is/are eligible to tender for the work,
i) Shall have successfully completed at least one similar
nature of work, & not less than 50% of the amount put
to tender & completed satisfactorily. The Contractor
who has/have completed the similar work on his/their
own should produce a certificate from an officer not
below the rank of Executive Engineer.
ii) Annual turnover shall not be less than 100% of the
amount put to tender in at lest two financial year during
last Five years.
iii) Shall be registered KPWD of respective class. The
registration/certification should have been formed/obtained
prior to the date of notification.
iv) The bidder should also furnish the list of works
on hand with all details such as Bid cost, Date of entrustment,
Stipulated date of completion, Actual date of completion,
Completed cost of work.
v) The bidder also furnish the list of equipments &
vehicles as mentioned in the instructions of technical
bid. Tendering by a Joint Venture of contractors is
permissible subject to following conditions.
a) The joint venture shall have been formed prior to
the tendering and the blank tender form shall have been
applied for and purchased by the joint venture itself.
b) The principal partner of the joint venture, duly
authorized with a legally binding power of attorney
to apply for tender forms and to sign the tender on
behalf of joint venture, shall have been a Registered
firm, eligible for tendering.
c) Bidder/Tenderer is not eligible to participate as
partner of more than one joint venture. The necessary
certificates/ documents in support of pre qualification
criteria fulfilled as stipulated shall be scanned and
attached to e-tender document. The original certificates/
documents shall be produced at the time of opening of
tender for verification. Scanned signature of the bidder/consultant/authorized
representatives of the bidder shall be attached while
uploading the bid document.
5. NOTES
a. The intending bidders are advised to visit the site
of work, before attending the pre-bid meeting and also
submitting their tenders.
b. The contractor/ authorized signatory should attach
his/her scanned signature to the Schedule-B before uploading
the documents.
c. If any of the dates mentioned above happened to be
a general holiday, the next working day holds good.
d. Further information can be had from the undersigned
during office hours.
e. Conditional tenders are liable to be rejected. The
officer competent to accept the tender shall have the
right to reject any or all the tenders without assigning
any reason whatsoever. f. Corrigendum will be published
in the web site / news papers for all modifications/
corrections if any.
g. The intending bidders should note that, if any of
lands either in part/ parts or in whole required for
the work is not acquired by the Nigam, it shall be the
responsibility of the bidder to take possession of such
land and start the work by consent of the land owners
before commencement of work at no extra cost to the
Nigam and no claim / delays whatsoever relating to on
account of non availability of land would be entertained.
h. The contractor should abide by the directions of
the Government towards recovery of 1% (or as modified
by Government from time to time) Cess from the contractors
bill under the provisions of Building and other Constructions
Workers Welfare Cess Act 1996.
i. The successful bidder shall execute a contract agreement
on stamp paper purchased in Karnataka for a value of
Rs.200/- in the form prescribed by the Engineer as in
Annexure-B within 14 days from the date of receipt of
detailed order.
|